Operation Rules of Straight Wire Drawing Machine

Apr 03, 2020

(1) Before starting the equipment, check the air pressure, cooling water circulation system, motor belt and reel, etc., whether the air pressure is sufficient, the cooling water circulation system is smooth, whether there is debris on the motor belt and reel, and whether the safety facilities are sensitive Wait.

(2) The blank wire should be installed into the pay-off frame according to the process requirements.

(3) The metering value should be set according to product requirements to prevent problems.

(4) Set the drawing speed, pay attention to the appropriate.

(5) In the process of equipment drawing, pay attention to whether there is any abnormality, etc. At this time, the machine shield cannot be opened.