Home > Exhibition > Content

Quality control and after-hour operation of the water tank drawing machine

Jul 30, 2018

When drawing the aluminum material, the water tank drawing machine should pay attention to the inspection of the aluminum rod in advance to ensure the use of qualified aluminum rods. And the aluminum rod welding should be smooth and firm. Production personnel also need to patrol frequently to ensure that the water tank drawing machine equipment is operating normally, measuring the wire diameter and observing the surface condition of the wire, and found that the lubrication is poor and the wire mold is worn.

 

Secondly, it should be noted that the main motor and the fixed speed motor and the pull wire speed are synchronized and the constant tension is taken up. It is found that the synchronization is not synchronized or the tension is not constant, and the cable should be adjusted in time. After the drawing drum of the water tank drawing machine is worn, it can be exchanged inside and outside. After both sides are worn, the drawing rim can be replaced.

 

The post-class operation requirements for the water tank wire drawing machine are as follows:

1. Products that pass the self-test must be affixed with qualified labels that meet the requirements, and should not be inserted into the coils and placed neatly in the designated position.

2. All cylinders should be in non-working state after work, and the extended piston rod must be polished. Clean up the work site, wipe the clean equipment, and make a record of the shift.http://www.chinawiredrawingmachine.com/