Detailed description of the debugging steps of the inverted wire drawing machine

Feb 18, 2019

Inverted wire drawing machines are becoming more and more popular, but there is a reason for this. Before installation, select the appropriate location, then place the inverted wire drawing machine of our choice on a stable floor and follow the instructions.

 

According to the foot hole of the machine base, fix it on the pre-punched cement base with suitable expansion screws to fix it. Then check if the inverted wire drawing machine is stable and the accessories are complete. When tightening the equipment, care should be taken to adjust the position of the main unit to ensure that the center of the reel and the center of rotation of the cart are in the same position.

 

At the same time, pay attention to the adjustment of the host, it should be ensured that the car can keep moving smoothly in the process of moving back and forth. In addition, it is necessary to properly connect the electrical circuit of the equipment according to the requirements of electricity consumption to ensure no leakage or short circuit. After the installation is complete, it is followed by debugging.

 

Before that, we need to check if the installation is complete and check that the bolts are tight. Then, inject a proper amount of lubricating oil into the interior of the inverted wire drawing machine, and at the same time, check the center position through the observation hole to ensure the height is suitable. In addition, care should be taken to ensure that there is no oil leakage in the body of the reduction gearbox. Then start it under no-load condition. At this time, you should pay attention to check whether its running state can be kept stable, whether there will be large noise, or obvious vibration problem. During the operation of the empty load, try to control each control button to control various actions such as starting, normal operation, and parking of the whole machine.www.chinawiredrawingmachine.com